Wikiposts
Search
Professional Pilot Training (includes ground studies) A forum for those on the steep path to that coveted professional licence. Whether studying for the written exams, training for the flight tests or building experience here's where you can hang out.

How long for CPL (Modular)

Thread Tools
 
Search this Thread
 
Old 14th May 2009, 10:25
  #1 (permalink)  
Thread Starter
 
Join Date: May 2008
Location: Ireland
Posts: 25
Likes: 0
Received 0 Likes on 0 Posts
How long for CPL (Modular)

If all factors or in my favour , weather, aircract and instructor availability etc... How long should it take to do the modular CPL course??? cheers...
Tom Power is offline  
Old 14th May 2009, 10:28
  #2 (permalink)  
 
Join Date: Apr 2007
Location: Europe
Posts: 651
Likes: 0
Received 0 Likes on 0 Posts
If you do it full time, 3-5 months I'd say. That's without the ATPL exams of course.

edit:

My bad, I counted in PPL + hrs building too, I'm sure it can be done in 2 or even less.

Last edited by INNflight; 14th May 2009 at 14:17.
INNflight is offline  
Old 14th May 2009, 10:32
  #3 (permalink)  
 
Join Date: Oct 2005
Location: uk
Posts: 919
Likes: 0
Received 0 Likes on 0 Posts
3-5 months , I would have said 2-6 weeks.
mcgoo is offline  
Old 14th May 2009, 10:36
  #4 (permalink)  
 
Join Date: Dec 2004
Location: A place where something is or could be located; a site.
Posts: 455
Likes: 0
Received 0 Likes on 0 Posts
Seem to remember it taking 6 weeks with poor wx and a few tech issues - full time.

Part time is a piece of string I'm afraid.

EK
EK4457 is offline  
Old 14th May 2009, 10:43
  #5 (permalink)  
 
Join Date: Sep 2005
Location: Inside the roster matrix
Posts: 617
Likes: 0
Received 0 Likes on 0 Posts
It took me about 7 weeks inc the MEP as I did the lot on the twin. 2 weeks of that was keeping current while waiting for a good test day, which I had to bin after 40 mins due to a lowering cloud base. After planning the div back to Bournemouth in the lower ground, I asked the examiner if we could get the cts and single engine work done, just leaving the nav. Job done!
Keep 20% in your back pocket for unplanned extras.
PAPI-74 is offline  
Old 14th May 2009, 11:20
  #6 (permalink)  
 
Join Date: May 2009
Location: north of the south
Age: 56
Posts: 157
Likes: 0
Received 0 Likes on 0 Posts
yeh took me five weeks and 7 for the ir
GearDownFlaps is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.