Go Back  PPRuNe Forums > Aircrew Forums > Military Aviation
Reload this Page >

New images of CVF FR (PA2)

Wikiposts
Search
Military Aviation A forum for the professionals who fly military hardware. Also for the backroom boys and girls who support the flying and maintain the equipment, and without whom nothing would ever leave the ground. All armies, navies and air forces of the world equally welcome here.

New images of CVF FR (PA2)

Thread Tools
 
Search this Thread
 
Old 17th Oct 2006, 00:03
  #1 (permalink)  
Suspicion breeds confidence
Thread Starter
 
Join Date: Jul 2002
Location: Gibraltar
Posts: 2,406
Likes: 0
Received 15 Likes on 4 Posts
New images of CVF FR (PA2)

Many thanks to esp49129 on the RN board for posting them. She looks a nice beast.

Here
Navaleye is offline  
Old 17th Oct 2006, 08:02
  #2 (permalink)  
 
Join Date: Mar 2005
Location: On the outside looking in
Posts: 542
Likes: 0
Received 0 Likes on 0 Posts
Is that arrow on the flt deck so they know which way to go?

sw
Safeware is offline  
Old 17th Oct 2006, 08:16
  #3 (permalink)  
 
Join Date: Nov 2004
Location: UK
Posts: 932
Likes: 0
Received 0 Likes on 0 Posts
Eureka!

Great timing-- Main Building can get their colour laser printers running over time printing out an elevation of it, mount in on some marine ply, laminate it, and mount in on some rigid raiders and sail up and down the DPRK coast!!

(Actually, does look good. And even better without silly skijumpy thing for proper carrier ops. Do we know if this is PA2 only? At least since they screwed up with CdG, presumably the French know how much stopping space an E-2C takes up... )

S41
Squirrel 41 is offline  
Old 17th Oct 2006, 08:16
  #4 (permalink)  
London Mil
Guest
 
Posts: n/a
Originally Posted by Safeware
Is that arrow on the flt deck so they know which way to go?
sw

... and as you can see, it always points away from the enemy.
 
Old 17th Oct 2006, 08:37
  #5 (permalink)  
Ecce Homo! Loquitur...
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,994
Received 2,051 Likes on 920 Posts
Bomb - HERE......

The front part of the deck looks remarkably devoid of markings and fixtures & fittings. Are there a couple of catapults and/or blast deflectors there, or are they going to just rely on waist catapults and only use it as a deck park?
ORAC is offline  
Old 17th Oct 2006, 09:01
  #6 (permalink)  
 
Join Date: Apr 2006
Location: Portsmouth
Posts: 548
Received 188 Likes on 98 Posts
One cat down the port side of the bow, one in the port waist - shedloads of space for a recovery - looks like a sensible arrangement to me.

Shame it's only an artists impression. I wonder how much of teh systems design has been done......
Not_a_boffin is offline  
Old 17th Oct 2006, 09:05
  #7 (permalink)  
 
Join Date: Apr 2003
Location: SWAPS Inner
Posts: 567
Likes: 0
Received 0 Likes on 0 Posts
But its a boat! I thought this was a website for people who like planes!!!
thunderbird7 is offline  
Old 17th Oct 2006, 09:11
  #8 (permalink)  
Suspicion breeds confidence
Thread Starter
 
Join Date: Jul 2002
Location: Gibraltar
Posts: 2,406
Likes: 0
Received 15 Likes on 4 Posts
Don't they fly off it?

BTW the big arrow on the angled is a visual landing aid.
Navaleye is offline  
Old 17th Oct 2006, 09:20
  #9 (permalink)  
WPH
 
Join Date: Feb 2006
Location: Cambs
Posts: 110
Likes: 0
Received 0 Likes on 0 Posts
Naveleye,

Good point - I'm off to start a thread on runway construction techniques, which should generate an equal amount of interest!

WPH
WPH is offline  
Old 17th Oct 2006, 09:28
  #10 (permalink)  
Blame My Parrot
 
Join Date: Apr 2005
Location: Somerdorset, UK
Age: 69
Posts: 227
Likes: 0
Received 0 Likes on 0 Posts
I have it on good authority that, due to the twin island design, Commanders (Air) will have to pass a stringent fitness test prior to taking up their appointments - this is so that they can descend 4 decks, sprint forward through 12 sections and then ascend 5 decks every time the Captain screams "WINGS - BRIDGE - AT THE RUSH"!!
VitaminGee is offline  
Old 17th Oct 2006, 09:40
  #11 (permalink)  
 
Join Date: Oct 2004
Location: Somerset
Posts: 80
Likes: 0
Received 0 Likes on 0 Posts
Have they got BAe written on the forward tower and THALES written on the rear tower?

Can you see the glue where've they joined the two halves together?

After all, BAe are building the front bit and THALES building the rear bit, aren't they?
BattlerBritain is offline  
Old 17th Oct 2006, 11:34
  #12 (permalink)  
 
Join Date: Jun 2006
Location: Somerset
Posts: 196
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by VitaminGee
I have it on good authority that, due to the twin island design, Commanders (Air) will have to pass a stringent fitness test prior to taking up their appointments - this is so that they can descend 4 decks, sprint forward through 12 sections and then ascend 5 decks every time the Captain screams "WINGS - BRIDGE - AT THE RUSH"!!

I expect the fisheads will just string up a light jackstay or something for him to be pulled back and forth!

PS - Which ones the Admiral's bridge/viewpoint? And more importantly, where the hell do goofers stand eh? Or are we to watch t/off's/lndg's over a TV like on Nimitiz class carriers?
Mr-AEO is offline  
Old 17th Oct 2006, 12:53
  #13 (permalink)  
 
Join Date: Feb 2006
Location: A lot closer to the sea
Posts: 665
Likes: 0
Received 0 Likes on 0 Posts
Looks like a good viewpoint on the back of the fwd superstructure to me.
WhiteOvies is offline  
Old 17th Oct 2006, 13:05
  #14 (permalink)  
 
Join Date: Jun 2006
Location: Somerset
Posts: 196
Likes: 0
Received 0 Likes on 0 Posts
Ah yes. I see it now! Perhaps the multiplicity of decks at 01 and above sent me silly!
Mr-AEO is offline  
Old 17th Oct 2006, 13:18
  #15 (permalink)  
 
Join Date: Feb 2006
Location: A lot closer to the sea
Posts: 665
Likes: 0
Received 0 Likes on 0 Posts
By the look of your tag you ought to be able to blag flight deck access if required anyway! The view is much better from down there.
WhiteOvies is offline  
Old 17th Oct 2006, 13:39
  #16 (permalink)  
 
Join Date: Jan 2001
Location: UK
Posts: 887
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by BattlerBritain
After all, BAe are building the front bit and THALES building the rear bit, aren't they?
'I say, old bean, your bit's much smaller than ours. Have you used imperial as we asked?'
'Zut alors, mon ami, ah em sure we agrrreed on le metrrric.'
Zoom is offline  
Old 17th Oct 2006, 14:23
  #17 (permalink)  
 
Join Date: Nov 2001
Location: western europe
Posts: 1,367
Likes: 0
Received 0 Likes on 0 Posts
Hope it's long enough to prevent this ......

hobie is offline  
Old 17th Oct 2006, 14:41
  #18 (permalink)  
GPMG
Guest
 
Posts: n/a
OK thats the funniest pic of an aviation misshap I have ever seen.
 
Old 17th Oct 2006, 17:05
  #19 (permalink)  
Registered User **
 
Join Date: Oct 2005
Location: LONDON
Posts: 372
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by WPH
Good point - I'm off to start a thread on runway construction techniques, which should generate an equal amount of interest!
WPH
Now I am glad you said that because I have been looking at runway construction techniques in the ice flows of the far North and this is what I think you need for a good ice runway.
Vital Features of an ice runway site must include:
1.. An alignment of the aerodrome with the wind
2.. The runway should definitely conform to the longitudinal and side slope to both the aircraft's and Civil Aviation Safety Authority's limits
3.. You should build it on a reasonably smooth surface.
4.. And finally no melt through the ice layers, or weaknesses will occur. I.e the plane will fall through the ice.
movadinkampa747 is offline  
Old 17th Oct 2006, 17:58
  #20 (permalink)  
WPH
 
Join Date: Feb 2006
Location: Cambs
Posts: 110
Likes: 0
Received 0 Likes on 0 Posts
movadinkampa747,

Thanks for your well informed advice on site selection for ice runways however, as you'll appreciate the construction is far more complex. I would chose the following method:
An ice runway for a C 130 for example could be constructed with a 14G laser-guided grader, a snow blower, a snow plane, a bulldozer,
two towed rollers, and a load cart (that is, a cart equipped with
C-130 or C-141 wheels and loaded with sufficient weight to
simulate the pressure of a taxiing C-130 or C-141 aircraft) to
test the runway surface. The grader is used for initial
preparation to remove bumps or waves in the runway surface, but
the overall slope of the surface does not need to be modified. A snow blower
can then be used to clear snow so the surfaces can be prepared, to
remove ice removed by the grader, and to cover the prepared
surface with snow to prevent formation of melt ponds during the
warmest parts of the season. Construction of the runway requires
six people full time, and about the same size crew is required to
maintain the snow cover during the November-January period.

Maintenance of the runway is basically a snow
management problem. Because of the particular requirements of
the glacier-ice runway, both snow drifting and activities
that reduce the albedo of the ice or snow surface must be
carefully controlled. To minimize snow drifts, only the minimum
of facilities, primarily fuel tanks, and sanitary and emergency
facilities needed to support the 4 to 6 people working at the
site would be located there during the warm part of the season.
During the austral winter, when the runway is not in use, all
structures and navigational aids would need to be removed.

In addition to constructing the runway surface, shelters
would be moved to the site to provide support facilities for the
site. These shelters, including an emergency shelter, a
heated rest facility, and a toilet facility, would initially be
portable or temporary facilities. The use of portable structures
would reduce long-term problems with drifting snow. If more
permanent facilities are needed in the future, they would be
elevated above the surface to minimize snow drifting.

Fuel could be temporarily stored on site to refuel
aircraft, and all wastes, with the possible exception of grey
water which might be piped through the ice into the sea below,
would be taken to a suitable contractor. Initially, no precision
radar or TACAN would be required, as it is unlikely that power would be generated
on site. Testing would probably only require a flagged runway.
Should the site be used to extend the season, runway lights would
be needed in addition to other navigation aids similar to those
used at other sea-ice runways. If the runway
proves successful and the facilities take on a more permanent
nature, radar installation and power generation also would be required.

Otherwise, you could wait for the ice to melt and use one of those floating airfields (I think they're called aircraft carriers).
WPH is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.